|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsMany streets throughout the Town are in need of crack sealing and some pavement repair to protect against deterioration |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 31,690 | 0 | 31,690 |
Project Totals | $31,690 | $0 | $31,690 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Crack Seal street cracks, 1/4 or wider. Mastic Repair for wide cracks. Will be a city wide crack seal without pavement repair.