City of Chewelah
2024 Street Maintenance
Multiple Locations
TIB Award Amount
$54,587
Region: East   |   Legislative District: 7   |   Length: 0.00 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

City is in need of maintaining existing roadway system. Most roads have decent base but the pavement is deteriorating.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 54,587 2,873 57,460
Project Totals $54,587 $2,873 $57,460

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

City performed repair areas and crack sealing.