|
|
||||
Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsPavement cracks and pavement degradation exists on many roadway areas in the City. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 155,000 | 0 | 155,000 |
Project Totals | $155,000 | $0 | $155,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Clean and install crack sealant and dig out and repair areas.