Region: West | Legislative District: 40 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsThere are numerous streets within the Town that have experienced cracking (longitudinal, transverse, and alligator) that need to be crack sealed to extend the life of the pavement. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 99,324 | 11,036 | 110,360 |
Project Totals | $99,324 | $11,036 | $110,360 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
These various cracks will be cleaned and sealed.