Town of Friday Harbor
2024 Street Maintenance
Multiple Locations
TIB Award Amount
$99,324
Region: West   |   Legislative District: 40   |   Length: 0.00 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

There are numerous streets within the Town that have experienced cracking (longitudinal, transverse, and alligator) that need to be crack sealed to extend the life of the pavement.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 99,324 11,036 110,360
Project Totals $99,324 $11,036 $110,360

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

These various cracks will be cleaned and sealed.