City of Asotin
2024 Street Maintenance
Multiple Locations
TIB Award Amount
$56,525
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

Mutiple Segments on different roads in the city of Asotin have begun to form extensive cracks in the road surface. These Cracks are large and treatable through crack sealing to preserve the roads before further maintenance will be required. The City of Asotin is concerned that some of these roads will be put into a state of disrepair if maintenance does not occur

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 56,525 2,975 59,500
Project Totals $56,525 $2,975 $59,500

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

The best treatment at this time is to clean out the existing cracks, and seal them to prolong the useful life of these road segments.