Region: Puget Sound | Legislative District: 31 | Length: 0.20 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsCity-wide existing cracks in the asphalt to be cracked sealed 1020 LF. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 3,130 | 0 | 3,130 |
Project Totals | $3,130 | $0 | $3,130 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Crack sealing: Second Street-between Emery and Cascade 7 between Rainier and Union Hill (gravel pile) 29. Third Street-between SP Carbon River Road and Eleanor 98.5; between Eleanor and Tacoma 76; between Tacoma and Emery 38; between Emery and Carriage 225: between Carriage and Gravel Pile 104.8. Emery-between Franklin and Washington 520.8; between Washington and SR 162 528.9; between SR 162 and First 170; between Second and Third 135. Rainier-between SR 162 and Second 263.