Town of South Prairie
2024 Maintenance Project
Citywide Crack Seal
TIB Award Amount
$3,130
Region: Puget Sound   |   Legislative District: 31   |   Length: 0.20 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

City-wide existing cracks in the asphalt to be cracked sealed 1020 LF.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 3,130 0 3,130
Project Totals $3,130 $0 $3,130

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Crack sealing: Second Street-between Emery and Cascade 7 between Rainier and Union Hill (gravel pile) 29. Third Street-between SP Carbon River Road and Eleanor 98.5; between Eleanor and Tacoma 76; between Tacoma and Emery 38; between Emery and Carriage 225: between Carriage and Gravel Pile 104.8. Emery-between Franklin and Washington 520.8; between Washington and SR 162 528.9; between SR 162 and First 170; between Second and Third 135. Rainier-between SR 162 and Second 263.