Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsMany of the streets in the Town are in good shape, but starting to crack. Main Street and Broadway Street, has some rutting in the wheel paths and alligator cracking. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 114,500 | 0 | 114,500 |
Project Totals | $114,500 | $0 | $114,500 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Town-wide crack sealing and pavement repair at the Main Street and Broadway Street intersection.