City of Ritzville
2024 Street Maintenance
Multiple Locations
TIB Award Amount
$42,312
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

This will be a continuation of our successful SCMP Crack Seal Project in 2023 to provide needed crack seal on our street system to protect the moisture from penetrating the asphalt surface.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 42,312 2,227 44,539
Project Totals $42,312 $2,227 $44,539

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Crack sealing on several streets throughout the City.