Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsThis will be a continuation of our successful SCMP Crack Seal Project in 2023 to provide needed crack seal on our street system to protect the moisture from penetrating the asphalt surface. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 42,312 | 2,227 | 44,539 |
Project Totals | $42,312 | $2,227 | $44,539 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Crack sealing on several streets throughout the City.