|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsCrack seal on Main and front street |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 7,161 | 0 | 7,161 |
Project Totals | $7,161 | $0 | $7,161 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
The proposed solution would be crack sealing until we qualify for chip sealing.