City of Goldendale
Darland Drive Reconstruction
Railroad Ave to Mill St
TIB Award Amount
$963,753
Region: East   |   Legislative District: 14   |   Length: 0.42 mi. FY 2026 Small City Arterial Program (SCAP)

Existing Conditions

The roadway is in poor condition and lacks pedestrian facilities which results in pedestrians having limited access from this side of the town.

Project Funding

  TIB Funds Local Funds Total Costs
Design 93,266 10,363 103,629
Right of Way 0 0 0
Construction 870,487 96,720 967,207
Project Totals $963,753 $107,083 $1,070,836

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 5%

Description of Improvements

Project will add sidewalk and compliant ADA ramps as well as reconstruct the roadway.