Region: East | Legislative District: 7 | Length: 0.18 mi. | FY 2026 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsNon-compliant curb ramps, driveway accesses, and surface discontinuities existing which serves as obstacles for pedestrians accessing the stores, restaurants, and other businesses along this side of Daisy Street. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 8,654 | 55,446 | 64,100 |
Right of Way | 0 | 0 | 0 |
Construction | 67,771 | 434,229 | 502,000 |
Project Totals | $76,424 | $489,676 | $566,100 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
13.5% | 86.5% | 0% |
Phase II will construct sidewalk, compliant curb ramps, driveway accesses, remove tripping hazards, and remove other obstructions. This project will provide an ADA compliant access along the west side of Daisy Street (SR 17) from 3rd Ave SE to Main Avenue.