Region: East | Legislative District: 13 | Length: 0.50 mi. | FY 2026 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsRecently constructed housing developments have significantly increased traffic volumes on Apple Avenue and deteriorated the pavement condition. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 114,000 | 6,000 | 120,000 |
Right of Way | 0 | 0 | 0 |
Construction | 957,220 | 50,380 | 1,007,600 |
Project Totals | $1,071,220 | $56,380 | $1,127,600 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 0% |
The project will involve reconstructing the roadway, adding curbs to separate the street from the sidewalk, and slightly widening the roadway to better accommodate farm and industrial traffic.