City of Everson
S Harkness Street
W Main St to Lincoln St
TIB Award Amount
$683,671
Region: West   |   Legislative District: 42   |   Length: 0.06 mi. FY 2025 Small City Arterial Program (SCAP)

Existing Conditions

S Harkness is a street within the Downtown areas, adjacent to the City Park and many thriving businesses. The pedestrian facilities do not meet ADA standards, which lead pedestrians from on-street parking to the park and businesses. The pavement surface is cracking and full of utility patches. Some of the curb is settling. Sidewalk is shifting causing trip hazards. The storm system is aged, as can be seen by the style of catch basins originally installed. The water main is aged and will likely incur damage during street improvements.

Project Funding

  TIB Funds Local Funds Total Costs
Design 78,885 4,152 83,037
Right of Way 0 0 0
Construction 604,786 31,831 636,617
Project Totals $683,671 $35,983 $719,654

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Reconstruction of the roadway, on-street parking and pedestrian facilities. These improvements will allow renewed resilience and safe mobility within this important corridor. Installation of a new water main and storm system.