| Region: East | Legislative District: 7 | Length: 0.30 mi. | FY 2025 Small City Arterial Program (SCAP) |
| Agency Name | City of Okanogan |
| Funding Year | FY 2025 |
| Program | SCAP |
| Legislative District | 7 |
| Congressional District | 4 |
| Federal Route Number | |
| Project Length | 0.30 mi. |
| ADT | 0 |
| Functional Class | |
| Type of Work | |
| Project Contact | Shawn Davisson |
| Contact Email | publicworks@okanogancity.com |
| Milestone | Target Date |
|---|---|
| Environmental Documentation Complete & Permits Approved | |
| Right of Way Acquisition Complete | |
| Start Design Engineering | 02/01/2024 |
| Contract Advertisement | 01/01/2025 |
| Contract Award | 03/01/2025 |
| Project Closeout | 10/31/2025 |
![]() |
Existing ConditionsThe existing roadway is deteriorating and does not have any storm drainage facilities or pedestrian facilities. PCR ranged from 50-54 (2023 Data). All parallel routes lack sidewalks, including SR 215. |
| TIB Funds | Local Funds | Total Costs | |
|---|---|---|---|
| Design | 142,500 | 7,500 | 150,000 |
| Right of Way | 0 | 0 | 0 |
| Construction | 1,092,500 | 57,500 | 1,150,000 |
| Project Totals | $1,235,000 | $65,000 | $1,300,000 |
| TIB Participation | Local Match | Minimum Local Match |
|---|---|---|
| 95.0% | 5.0% | 5% |
Reconstruct 3rd Avenue from Irene Street to Greta Street. Two 11-foot HMA lanes with rolled curb and gutter on both sides will be installed, with an 8-foot gravel parking lane serving as a buffer for a 5-foot sidewalk. Storm Drainage facilities will also be installed.