| Region: East | Legislative District: 7 | Length: 0.16 mi. | FY 2025 Small City Arterial Program (SCAP) |
| Agency Name | City of Omak |
| Funding Year | FY 2025 |
| Program | SCAP |
| Legislative District | 7 |
| Congressional District | 4 |
| Federal Route Number | |
| Project Length | 0.16 mi. |
| ADT | 750 |
| Functional Class | |
| Type of Work | |
| Project Contact | Wayne Beetchenow |
| Contact Email | publicworks@omakcity.com |
| Milestone | Target Date |
|---|---|
| Environmental Documentation Complete & Permits Approved | |
| Right of Way Acquisition Complete | |
| Start Design Engineering | 02/01/2024 |
| Contract Advertisement | 03/01/2025 |
| Contract Award | 04/01/2025 |
| Project Closeout | 12/31/2025 |
![]() |
Existing ConditionsRoadway conditions exhibit transverse, longitudinal and alligator cracking; pavement rutting, and areas of asphalt repair patches. |
| TIB Funds | Local Funds | Total Costs | |
|---|---|---|---|
| Design | 108,490 | 5,710 | 114,200 |
| Right of Way | 0 | 0 | 0 |
| Construction | 831,915 | 43,785 | 875,700 |
| Project Totals | $940,405 | $49,495 | $989,900 |
| TIB Participation | Local Match | Minimum Local Match |
|---|---|---|
| 95.0% | 5.0% | 5% |
Pulverize, regrading, Cement Treated Base (CTB) and pave roadway. Construct two 10 foot wide travel lanes, blubouts, ADA ramps, sidewalk infill and replacement, replacement or new storm drain as needed.