City of Omak
Central Ave Reconstruction Phase II
Cedar St to Fir St
TIB Award Amount
$940,405
Region: East   |   Legislative District: 7   |   Length: 0.16 mi. FY 2025 Small City Arterial Program (SCAP)

Existing Conditions

Roadway conditions exhibit transverse, longitudinal and alligator cracking; pavement rutting, and areas of asphalt repair patches.

Project Funding

  TIB Funds Local Funds Total Costs
Design 108,490 5,710 114,200
Right of Way 0 0 0
Construction 831,915 43,785 875,700
Project Totals $940,405 $49,495 $989,900

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Pulverize, regrading, Cement Treated Base (CTB) and pave roadway. Construct two 10 foot wide travel lanes, blubouts, ADA ramps, sidewalk infill and replacement, replacement or new storm drain as needed.