Region: East | Legislative District: 7 | Length: 0.16 mi. | FY 2025 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsRoadway conditions exhibit transverse, longitudinal and alligator cracking; pavement rutting, and areas of asphalt repair patches. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 108,490 | 5,710 | 114,200 |
Right of Way | 0 | 0 | 0 |
Construction | 831,915 | 43,785 | 875,700 |
Project Totals | $940,405 | $49,495 | $989,900 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Pulverize, regrading, Cement Treated Base (CTB) and pave roadway. Construct two 10 foot wide travel lanes, blubouts, ADA ramps, sidewalk infill and replacement, replacement or new storm drain as needed.