Region: West | Legislative District: 42 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThe Everson Elementary School currently has no sidewalks along SR 544 going to the northeast of the school on that side of the road, and only intermittent sidewalks on the east side of SR 544. There is not a consistent linear path for pedestrians and students to the safely travel to the elementary school from other parts of town. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 564,867 | 2,505,071 | 3,069,938 |
Project Totals | $564,867 | $2,505,071 | $3,069,938 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
18.4% | 81.6% | 5% |
The project provides 8.0 wide sidewalks connecting downtown Everson with Everson Elementary School. Elementary Students and other pedestrians will be provided with safe and ADA compliant facilities.