Region: East | Legislative District: 9 | Length: 0.42 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsW. Fir Street has been identified as a location with high pedestrian activity within the City of Connell that lacks pedestrian facilities yet contains nearly 200 homes and connects multiple public and private pedestrian generators. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 54,000 | 6,000 | 60,000 |
Right of Way | 0 | 0 | 0 |
Construction | 438,030 | 48,670 | 486,700 |
Project Totals | $492,030 | $54,670 | $546,700 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Install a cement concrete sidewalk, traffic curb and gutter as needed for ADA compliance, sidewalk ramps, and crosswalk lines along W. Fir Street.