City of Toppenish
Downtown Intersection Improvements
Intersection Improvements
TIB Award Amount
$1,529,554
Region: East   |   Legislative District: 14   |   Length: 0.00 mi. FY 2026 Complete Streets Program (CSP)

Existing Conditions

The intersection of S. Toppenish Avenue and W. 1st Avenue existing sidewalks, curb ramps, and crosswalks are non-ADA compliant and do not provide a safe route for pedestrian travel. The lane widths are over 16 feet wide and not ideal for safely crossing the street. The intersections roadway surface is deteriorating asphalt.

Project Funding

  TIB Funds Local Funds Total Costs
Design 175,968 19,552 195,520
Right of Way 0 0 0
Construction 1,353,586 150,399 1,503,985
Project Totals $1,529,554 $169,951 $1,699,505

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

The project includes roadway, sidewalks, bulb outs, curb ramps, crosswalks, signal with pedestrian push buttons, and landscaping improvements.