City of Bellingham
James Street Multimodal Safety Improvements
Telegraph Rd to Gooding Ave
TIB Award Amount
$950,000
Region: West   |   Legislative District: 42   |   Length: 0.00 mi. FY 2026 Complete Streets Program (CSP)

Existing Conditions

James St. is the only north-south transportation corridor that could provide a low stress multimodal connection from the city core to the developing areas. Currently, James St. is a rural roadway with two asphalt paved lanes averaging 12-foot lane widths and no pedestrian or bicycle facilities.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 950,000 2,269,000 3,219,000
Project Totals $950,000 $2,269,000 $3,219,000

Local Match

TIB Participation Local Match Minimum Local Match
29.5% 70.5% 20%

Description of Improvements

Construct multiuse pathway on west side identified in the 2019 James St. Multimodal Feasibility Study. Project will include a roadway overlay and reconstruction of unpassable fish barriers.