Region: West | Legislative District: 42 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsJames St. is the only north-south transportation corridor that could provide a low stress multimodal connection from the city core to the developing areas. Currently, James St. is a rural roadway with two asphalt paved lanes averaging 12-foot lane widths and no pedestrian or bicycle facilities. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 950,000 | 2,269,000 | 3,219,000 |
Project Totals | $950,000 | $2,269,000 | $3,219,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
29.5% | 70.5% | 20% |
Construct multiuse pathway on west side identified in the 2019 James St. Multimodal Feasibility Study. Project will include a roadway overlay and reconstruction of unpassable fish barriers.