|
|
||||
Region: East | Legislative District: 17 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsSR 14 (Steuben Street) has an Average Annual Daily Traffic (AADT) of approximately 10,000 vehicles per day. Visibility is low at this corner due to oncoming traffic and shoulder parking. There is also little to no lighting on the road during the night, making turning movements more difficult. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 25,460 | 1,340 | 26,800 |
Right of Way | 0 | 0 | 0 |
Construction | 191,045 | 10,055 | 201,100 |
Project Totals | $216,505 | $11,395 | $227,900 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
The project will add an illumination system and RRFBs on both sides of SR 14, at the eastern end of the intersection. The sidewalk ramps and curbing on the two eastern corners will also be replaced.