Region: East | Legislative District: 15 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsInsufficient pedestrian amenities deter foot traffic and limit opportunities for economic growth and revitalization. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 80,769 | 8,974 | 89,743 |
Right of Way | 0 | 0 | 0 |
Construction | 619,231 | 68,803 | 688,034 |
Project Totals | $700,000 | $77,777 | $777,777 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
The project consists of the construction of pedestrian bulb-outs for safety and better pedestrian access along First Avenue.