Region: Puget Sound | Legislative District: 31 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThis project seeks to improve the safety of the crossings across Main St, Parker Rd E, and Valley Ave around Sumner High School and some of the downtown businesses. This project will install rapid flashing beacons, curb bulb outs, and refresh the painted crosswalks. These crossings are very busy due to the number of students that attend Sumner High School who walk to and from school, and those in the community who walk to the surrounding businesses. Some of these crossings do not have pedestrian visibility, and this corridor is very active with traffic at all times of the day. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 149,443 | 46,505 | 195,948 |
Right of Way | 0 | 0 | 0 |
Construction | 597,771 | 186,021 | 783,792 |
Project Totals | $747,214 | $232,526 | $979,740 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
76.3% | 23.7% | 20% |
This project will install rapid flashing beacons, curb bulbs, and refresh the painted crosswalks at the following locations: Main Street and Alder Avenue Main Street and Ryan Avenue Main Street and Bonney Avenue Main Street and Lewis Avenue 60th Street/Main Street/162nd Street