City of Lakewood
112th Street and Idlewild Road Sidewalk
Interlaaken Drive to Idlewild Elementary
TIB Award Amount
$727,000
Region: Puget Sound   |   Legislative District: 28   |   Length: 0.00 mi. FY 2026 Complete Streets Program (CSP)

Existing Conditions

As a part of the Citys Non-Motorized Plan, a 2.4 mile sidewalk connection between Steilacoom Boulevard. and Washington Boulevard. is to be constructed along Hipkins Rd., 104th St., Idlewild Rd., 112th St., and Interlaaken Drive, Existing sidewalk within the corridor accounts for 0.7 miles. The City is currently constructing sidewalk along Hipkins Rd., extending it an additional 1.0 miles. The project described in this application would extend sidewalk an additional 0.2 miles. The City is planning a project to construct the final 0.7 miles of sidewalk in 2025 along Interlaaken Dr. between 112th St. and Washington Blvd. This will connect Idlewild Elementary to numerous residences throughout the area.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 727,000 182,000 909,000
Project Totals $727,000 $182,000 $909,000

Local Match

TIB Participation Local Match Minimum Local Match
80.0% 20.0% 20%

Description of Improvements

This project will complete the pedestrian facilities along 112th Street SW and Idlewild Road SW between Interlaaken Drive SW and Idlewild Elementary.