Region: West | Legislative District: 10 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThis project fill two pedestrian sidewalk gaps and install a RRFB. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 290,000 | 23,800 | 313,800 |
Project Totals | $290,000 | $23,800 | $313,800 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
92.4% | 7.6% | 5% |
720 LF of new sidewalk, new crosswalk with RRFB and ADA ramp, minor drainage improvements