Region: East | Legislative District: 15 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThe immediate need for the community is to replace non-ADA compliant ramps and install crosswalks where none exist or are non-compliant. The priority non-compliant ADA ramps are on walking routes to schools or within the downtown corridors where walkability and connectivity is important. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 47,073 | 8,307 | 55,380 |
Right of Way | 0 | 0 | 0 |
Construction | 390,065 | 68,835 | 458,900 |
Project Totals | $437,138 | $77,142 | $514,280 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
The project will replace 26 non-compliant ADA ramps and will replace 13 non-compliant crosswalk markings and/or add crosswalk markings where none exist.