Region: East | Legislative District: 7 | Length: 0.42 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThe sidewalk along Saunders Road ends at the entrance of Pit Pond and there is not a bike lane in the City. Standard two lane road no shoulders. Several recreational facilities on the route. The City finalized and adopted a trail plan. The city is a rural, low income community, over 50% minority residents. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 46,220 | 0 | 46,220 |
Right of Way | 0 | 0 | 0 |
Construction | 338,780 | 0 | 338,780 |
Project Totals | $385,000 | $0 | $385,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
The proposed project is to construct up to 1/2 mile of an 8 foot paved, non-motorized pathway adjacent to Saunders Road and Putter Pond with parking, pull-outs landscaping, and wayfinding.