Region: West | Legislative District: 17 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThis project will enhance pedestrian and bicyclist safety measures at the uncontrolled intersection of NE 3rd Ave. between NE Adams St. and NE Cedar St. in downtown Camas. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 47,571 | 11,892 | 59,463 |
Right of Way | 0 | 0 | 0 |
Construction | 309,207 | 77,303 | 386,510 |
Project Totals | $356,778 | $89,195 | $445,973 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
This project will install two Rectangular Rapid Flashing Beacons, four crosswalk lights, traffic calming islands and bike lanes extending one block east and one block west of the intersection.