City of Castle Rock
2025 ADA Improvements
Multiple Locations
TIB Award Amount
$536,170
Region: West   |   Legislative District: 19   |   Length: 0.00 mi. FY 2026 Complete Streets Program (CSP)

Existing Conditions

This project will update and install ADA ramps at intersections throughout the city. There are currently 22 ADA ramps that need to be updated or installed to current standards. Approximately half of these ADA ramps have sidewalks but do not have an ADA ramp at all. This project also includes constructing two sections of sidewalks that eliminate gaps for pedestrians.

Project Funding

  TIB Funds Local Funds Total Costs
Design 61,864 3,256 65,120
Right of Way 0 0 0
Construction 474,306 24,964 499,270
Project Totals $536,170 $28,220 $564,390

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

This project is to install 22 ADA ramps and add two new sidewalk sections. The additional sidewalks include 420 of new sidewalks, creating safer access for pedestrians of all ages and abilities.