Region: West | Legislative District: 19 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThis project will update and install ADA ramps at intersections throughout the city. There are currently 22 ADA ramps that need to be updated or installed to current standards. Approximately half of these ADA ramps have sidewalks but do not have an ADA ramp at all. This project also includes constructing two sections of sidewalks that eliminate gaps for pedestrians. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 61,864 | 3,256 | 65,120 |
Right of Way | 0 | 0 | 0 |
Construction | 474,306 | 24,964 | 499,270 |
Project Totals | $536,170 | $28,220 | $564,390 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |