Town of Cathlamet
S 3rd Street Sidewalk
Maple St to Alder St
TIB Award Amount
$224,887
Region: West   |   Legislative District: 19   |   Length: 630.00 ft. FY 2026 Urban Active Transportation Program (ATP)

Existing Conditions

Only a grassy uneven shoulder strip currently exists on the North side of S. 3rd Street, connecting the elementary and high schools, outside a cyclone fence, with little in the way of curbs or any form of barrier or protection between children and the street. The existing shoulder strip becomes muddy and dangerous to students during the rainy winter months

Project Funding

  TIB Funds Local Funds Total Costs
Design 25,947 0 25,947
Right of Way 0 0 0
Construction 198,940 0 198,940
Project Totals $224,887 $0 $224,887

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

This project creates a safe, connected and accessible sidewalk on the north side of S. 3rd St. in front of Julius A. Wendt Elementary School campus, connecting to the Wahkiakum High School campus, separating children and foot traffic from school buses and other moving vehicles.