City of Cashmere
Sidewalk Improvements
City of Cashmere
TIB Award Amount
$650,256
Region: East   |   Legislative District: 12   |   Length: 1,000.00 ft. FY 2026 Urban Active Transportation Program (ATP)

Existing Conditions

Olive Street is a major collector in Cashmere and much of the land (former orchard) has been or is in the process of conversion to residential housing. Sidewalks gaps exist on Olive and Maple streets and concerns exist with crossings at Olive/Chase Intersection which is a walk route. Maple Street is missing a short section of sidewalk that needs to be added.

Project Funding

  TIB Funds Local Funds Total Costs
Design 56,653 2,982 59,635
Right of Way 0 0 0
Construction 593,603 31,242 624,845
Project Totals $650,256 $34,224 $684,480

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Olive Street: sidewalk infill, mprove stormwater management, add crosswalk with flashing beacons at the Chase Street Intersection. Maple Street: sidewalk infill.