Region: Puget Sound | Legislative District: 33 | Length: 700.00 ft. | FY 2026 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsEngagement for the Transportation Master Plan in 2019 identified this gap in the pedestrian network as a priority to be filled. 83rd Ave S provides a first-mile, last-mile link between transit along East Valley Highway (84th Ave S) and the southern segment of the Kent Manufacturing Industrial Center. According to PSRC data, there are approximately 3,000 family-wage jobs within 1-mile west of East Valley Highway for which this would be the shortest access path to transit and retail. transit sites are located just east of the proposed project on East valley Highway (84th Ave S). |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 64,000 | 16,000 | 80,000 |
Right of Way | 0 | 0 | 0 |
Construction | 561,600 | 140,400 | 702,000 |
Project Totals | $625,600 | $156,400 | $782,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
The project will complete the gap in sidewalk along the west side of 83rd Avenue S by constructing about 700 feet of sidewalk in the existing right-of-way. The project will also include a concrete apron across S 224th Street and construct ADA curb ramps.