City of Newcastle
SE May Creek Park Drive NonMotorized Improvements Phase 2
SE 84th Pl to 129th Ave SE
TIB Award Amount
$500,000
Region: Puget Sound   |   Legislative District: 41   |   Length: 2,200.00 ft. FY 2026 Urban Active Transportation Program (ATP)

Existing Conditions

Providing a continuous pedestrian and bicycle facilities along SE May Creek Park Drive has been a priority for the City for years. The City has constructed multiple phases of pedestrian and bicycle facilities on almost 80 percent of the corridor. The final segment, between SE 84th Street and 129th Avenue SE, represents the final gap and completes a continuous loop around the City (116th Ave SE, Newcastle Way, Coal Creek Parkway SE, and finally SE May Creek Park Drive). SE May Creek Park Drive is a regional route for recreational bicycle users. It is common for over one hundred cyclists to travel along this route on a given weekend.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 500,000 1,683,170 2,183,170
Project Totals $500,000 $1,683,170 $2,183,170

Local Match

TIB Participation Local Match Minimum Local Match
22.9% 77.1% 20%

Description of Improvements

Widens the road to provide two 10-foot wide travel lanes and two 6-foot bike lanes along with curb, gutter and sidewalks the northeast side of the road.