City of Richland
George Washington Way Sidewalk
Comstock St to Bradley Blvd
TIB Award Amount
$850,000
Region: East   |   Legislative District: 8   |   Length: 1,411.00 ft. FY 2026 Urban Active Transportation Program (ATP)

Existing Conditions

Currently, there are no sidewalks on the east side of George Washington Way between Comstock Street and Bradley Boulevard.

Project Funding

  TIB Funds Local Funds Total Costs
Design 113,333 28,333 141,666
Right of Way 0 0 0
Construction 736,667 184,167 920,834
Project Totals $850,000 $212,500 $1,062,500

Local Match

TIB Participation Local Match Minimum Local Match
80.0% 20.0% 20%

Description of Improvements

The proposed project installs an 8-foot-wide sidewalk that will integrate with ADA facilities at Comstock Street and Bradley Boulevard.