City of Bremerton
Warren Ave Sidewalk
Burwell St to 4th St
TIB Award Amount
$43,320
Region: West   |   Legislative District: 26   |   Length: 200.00 ft. FY 2026 Urban Active Transportation Program (ATP)

Existing Conditions

There is currently no sidewalk on the east side of State Route 0303 (Warren Ave) between Burwell Street and 4th Street. There is a need for this project as this location is on the Pedestrian Access Route for the Downtown Bremerton District Center, Transit, and Puget Sound Naval Shipyard which are highly trafficked areas. This project will also improve pedestrian safety along a busy state route within the City by completing this sidewalk gap.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 43,320 13,680 57,000
Project Totals $43,320 $13,680 $57,000

Local Match

TIB Participation Local Match Minimum Local Match
76.0% 24.0% 20%

Description of Improvements

The solution to this need, is to utilize city crews to construct new sidewalk. This would improve pedestrian mobility, safety, and sidewalk connectivity.