Region: West   |   Legislative District: 18   |   Length: 500.00 ft. FY 2026 Urban Active Transportation Program (ATP)

Existing Conditions

The existing sidewalk ends on Highway 99 just south of the Tenny Creek crossing. Highway 99 is a four-lane principal arterial paralleling lnterstate-5 between downtown Vancouver and NE 134th Street and is one of the highest accident corridors in Clark County.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 500,001 720,999 1,221,000
Project Totals $500,000 $721,000 $1,221,000

Local Match

TIB Participation Local Match Minimum Local Match
41.0% 59.0% 20%

Description of Improvements

This project will construct new raised concrete curb and sidewalk on the east side of Highway 99 and south side of NE 104th Street.