Region: Puget Sound | Legislative District: 30 | Length: 1.35 mi. | FY 2026 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsPedestrians currently walk in the the parking lanes along Algona Boulevard N. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 52,749 | 5,861 | 58,610 |
Right of Way | 0 | 0 | 0 |
Construction | 492,309 | 54,701 | 547,010 |
Project Totals | $545,058 | $60,562 | $605,620 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 0% |
Algona Boulevard between Boundary Rd and S 5th St will be reconfigured with a separated non-motorized facility along the west side, narrower travel lanes and parking along along the east side.