Town of Coulee Dam
ADA Ramp Upgrades
Multiple Locations
TIB Award Amount
$481,406
Region: East   |   Legislative District: 7   |   Length: 1.00 mi. FY 2025 Urban Active Transportation Program (ATP)

Project Information

Agency Name Town of Coulee Dam
Funding Year FY 2025
Program ATP
Legislative District 7
Congressional District 4
Federal Route Number
Project Length 1.00 mi.
ADT 0
Functional Class
Type of Work
Project Contact Stefani Bowden
Contact Email cdclerk@couleedam.org

Project Schedule

Milestone Target Date
Start Design Engineering 02/01/2024
Contract Advertisement 02/01/2025
Contract Award 04/01/2025
Contract Completion 08/31/2025

Existing Conditions

This project either adds new or removes/replaces 46 ADA ramps in Coulee Dam per the attached exhibit. The goal with this project is to meet ADA ramp requirements in this area then submit for preservation funding the following year. The need is very straightforward, the City must meet the 2010 ADA requirements to the maximum extent feasible and either ADA ramps do not exist in these areas or the existing ramps do not comply with current standards. Several ramp replacements occur around the schools, commercial areas, and on the State Highway. This project will be advertised as a single package with the Safe Routes to School project that was awarded to the City earlier this year.

Project Funding

  TIB Funds Local Funds Total Costs
Design 64,805 0 64,805
Right of Way 0 0 0
Construction 416,601 0 416,601
Project Totals $481,406 $0 $481,406

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

The solution is to install or upgrade existing ramps to comply with the ADA standards and move forward with phase 2 of the project, which is preservation funding for this area of Town.