Region: Puget Sound | Legislative District: 26 | Length: 1,300.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsCurrently, there is a gap for active transportation users between Gig Harbor North and the waterfront and downtown areas. Users are currently forced to use the narrow shoulder to traverse the gap. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 1,524,574 | 3,207,095 | 4,731,669 |
Project Totals | $1,524,574 | $3,207,095 | $4,731,669 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
32.2% | 67.8% | 20% |
This project constructs a shared use path where there is currently a gap in bicycle and pedestrian facilities along the east side of Burnham Drive between the Eagles Club Driveway and 96th Street.