City of Kelso
2025 Overlay
Multiple Locations
TIB Award Amount
$484,648
Region: Southwest   |   Legislative District: 19   |   Length: 0.00 mi. FY 2026 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 17,000 3,000 20,000
Right of Way 0 0 0
Construction 467,648 82,527 550,175
Project Totals $484,648 $85,527 $570,175

Local Match

TIB Participation Local Match Minimum Local Match
85.0% 15.0% 15%

Description of Improvements

2 inch grind and overlay