Region: Northeast | Legislative District: 13 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 60,000 | 15,000 | 75,000 |
Right of Way | 0 | 0 | 0 |
Construction | 985,618 | 246,405 | 1,232,023 |
Project Totals | $1,045,618 | $261,405 | $1,307,023 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
Seal Coat and Striping Reconfiguration with 4 lanes to 3 Lanes, Intersection Optimization, Increased Parking, Bike Lanes and Sharrows, Reduced Crosswalk Lengths and future maintenance cost reductions.