City of Sultan
Sultan Basin Road Overlay
137th Pl SE to SR 2
TIB Award Amount
$655,085
Region: Puget Sound   |   Legislative District: 12   |   Length: 0.00 mi. FY 2026 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 90,360 10,040 100,400
Right of Way 0 0 0
Construction 564,726 62,749 627,475
Project Totals $655,085 $72,790 $727,875

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

Sultan Basin Road - 142nd St SE to SR 2 Edge grind and 2-inch overlay Sultan Basin Road - 137th Pl SE to 142nd St SE Edge grind and 2-inch overlay