|
|
||||
Region: Puget Sound | Legislative District: 33 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 28,896 | 5,104 | 34,000 |
Right of Way | 0 | 0 | 0 |
Construction | 329,803 | 58,252 | 388,055 |
Project Totals | $358,700 | $63,355 | $422,055 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Marine View Drive - SW 197th St to Edgecliff Dr SW 2-inch grind, overlay, pavement repair and 4 ADA ramps