Region: Northwest | Legislative District: 39 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 38,675 | 6,825 | 45,500 |
Right of Way | 0 | 0 | 0 |
Construction | 699,240 | 123,396 | 822,636 |
Project Totals | $737,915 | $130,221 | $868,136 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2 inch overlay