|
|
||||
Region: Southeast | Legislative District: 14 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 59,985 | 6,665 | 66,650 |
Right of Way | 0 | 0 | 0 |
Construction | 460,035 | 51,115 | 511,150 |
Project Totals | $520,020 | $57,780 | $577,800 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
2" grind and overlay.