Region: Northeast | Legislative District: 9 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 6,599 | 1,401 | 8,000 |
Right of Way | 0 | 0 | 0 |
Construction | 342,066 | 72,627 | 414,693 |
Project Totals | $348,664 | $74,029 | $422,693 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
82.5% | 17.5% | 15% |
2" grind and overlay. ADA ramp upgrades.