|
|
||||
Region: Northwest | Legislative District: 42 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 29,940 | 11,955 | 41,895 |
Right of Way | 0 | 0 | 0 |
Construction | 344,299 | 137,480 | 481,779 |
Project Totals | $374,239 | $149,435 | $523,674 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
71.5% | 28.5% | 20% |
2 inch grind and overlay