City of Fircrest
2024 Overlay
Multiple Locations
TIB Award Amount
$677,409
Region: Puget Sound   |   Legislative District: 28   |   Length: 0.00 mi. FY 2025 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 97,434 17,913 115,347
Right of Way 0 0 0
Construction 579,975 106,630 686,605
Project Totals $677,409 $124,543 $801,952

Local Match

TIB Participation Local Match Minimum Local Match
84.5% 15.5% 15%

Description of Improvements

Grind and 2-inch overlay ofClaremont Street - Alameda Ave and 67th Ave W with 8 ADA ramps.