|
|
||||
Region: Southwest | Legislative District: 17 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 105,400 | 18,600 | 124,000 |
Right of Way | 0 | 0 | 0 |
Construction | 523,026 | 92,299 | 615,325 |
Project Totals | $628,426 | $110,899 | $739,325 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2 inch grind and overlay