City of Walla Walla
Clinton Street Overlay
Isaacs Ave to Sumach St
TIB Award Amount
$400,000
Region: Southeast   |   Legislative District: 16   |   Length: 0.00 mi. FY 2025 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 44,888 90,112 135,000
Right of Way 0 0 0
Construction 355,112 712,888 1,068,000
Project Totals $400,000 $803,000 $1,203,000

Local Match

TIB Participation Local Match Minimum Local Match
33.3% 66.7% 20%

Description of Improvements

2 inch grind and inlay, crack seal and minor pavement repair. Replace non compliant ADA ramps.