Region: Northwest | Legislative District: 40 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 33,150 | 5,850 | 39,000 |
Right of Way | 0 | 0 | 0 |
Construction | 638,350 | 112,650 | 751,000 |
Project Totals | $671,500 | $118,500 | $790,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2 inch overlay